航空・防衛関連プロジェクトにおけるリソースの割り当て

Why do aviation and defense (A&D) manufacturers need enterprise resource planning (ERP) with built-in estimate at completion (EAC) and estimate to completion (ETC) capabilities? Because it's all about project manufacturing and project accounting.

In this white paper, you will learn about:

  • Cost reimbursement and cost-plus defense contracts, which require rigorous tracking of project or system cost so a standard markup can be applied, up to a set limit
  • Earned value management, a system where liquidity events are tied to the achievement of specific project milestones
  • Time and materials contracts, which tie payment on direct labor hours, actual materials cost and profit
  • Performance-based logistics (PBL), which requires project accounting across the entire lifecycle of the asset so they can profitably deliver on the promised level of availability

To learn more about solving project resource allocation problems with aerospace ERP, download the white paper.

File Information: ホワイトペーパー,   pdf   2.2 MB

ダウンロードホワイトペーパー

資料のダウンロードをご希望の方は、下記フォームからご登録をお願いします。(※フォームは、日本語で入力してください。)

Your Details